- A simple app typically takes 3 to 4 months, a mid-size app 4 to 6 months, and a complex app 6 to 9 months or more.
- Design and discovery take up a meaningful share of the timeline, and they save time later.
- Cross-platform frameworks can cut the time to ship iOS and Android, but not every app suits them.
- Leave time for testing, beta feedback and app store review before launch day.
Timeline by phase
| Phase | What happens | Typical duration |
|---|---|---|
| Discovery | Goals, users, scope, technical approach | 1 to 3 weeks |
| UX and UI design | User flows, wireframes, high-fidelity screens, prototype | 3 to 6 weeks |
| Development | App, back end, integrations, admin tools | 8 to 20 weeks |
| Testing and beta | QA, device testing, beta users, fixes | 2 to 4 weeks |
| App store submission | Store listings, review and release | Usually days, occasionally longer |
Some phases overlap. Development often starts on approved screens while the rest of the design is still being finished.
Typical totals by app type
| App type | Examples | Typical timeline |
|---|---|---|
| Simple | Booking, content or utility app with a few screens and basic sign-in | 3 to 4 months |
| Mid-size | Marketplace, fitness or finance app with payments and integrations | 4 to 6 months |
| Complex | Real-time features, several user types, offline mode, heavy data | 6 to 9+ months |
What speeds a project up
- A clear, prioritized scope for version one.
- Fast decisions and feedback from one empowered person on your side.
- Proven services for login, payments, notifications and analytics.
- A cross-platform framework when the app does not need deep native features.
What slows a project down
- Adding features mid-build without adjusting the timeline.
- Waiting on content, brand assets or third-party API access.
- Complex integrations with older systems.
- Skipping design and discovering problems during development.
Native or cross-platform?
Cross-platform frameworks let one codebase serve iOS and Android, which often shortens the timeline and lowers the cost. Fully native apps can make sense when you need the best possible performance, advanced device features or platform-specific experiences. Your discovery phase should settle this early, because it shapes the whole plan.
Planning an app? See our app development services or share your idea. If you are building a SaaS product too, our SaaS MVP cost guide may help with budgeting.
Frequently asked questions
Can an app be built in a month?
A very simple prototype or internal tool can be, but a polished, store-ready app with sign-in, a back end and testing usually takes at least three months.
How long does App Store review take?
Apple and Google reviews usually take from a few hours to a few days. Rejections for policy issues can add time, so build the store guidelines into your plan.
Does building for iOS and Android double the time?
Not necessarily. A cross-platform framework lets one team ship both from one codebase, adding far less than double the time for most apps.